This project provided repairs to an existing pumphouse and connected a new deep well into the Fort Lewis water distribution system. The scope...
Hot Water Distribution System at Olympic College – State of Washington
This project included field surveys and mapping of underground utilities throughout the campus area and provided for demolition of an existing...
Upgrade Central Vehicle Wash Facility – Yakima Training Center
This project involved design of repairs to a closed cycle wash facility for wheeled and tracked vehicles. Major work items included installation of...
Repair and Paint the Main Water Storage Reservoir – Yakima Training Center
This project accomplished design for interior and exterior painting of a 600,000 gallon water reservoir. Work included structural repairs and...
Installation of Backflow Preventers – Fort Lewis
This project involved the design of backflow prevention devices in 131 separate buildings for compliance to the “Cross Connection Control Manual”....
Wing HQ Renovation Study – McChord AFB
Feasibility study for phased renovation of Building 100 at McChord AFB. The building was originally designed in 1943 as a dormitory. It is a three...
Browse by Project Type
Our Committment
Washington Engineering is dedicated to exceptional, responsive client services and the highest quality of professional architectural and engineering consulting.