This project involved the design of backflow prevention devices in 131 separate buildings for compliance to the “Cross Connection Control Manual”. The usages involved a wide variety of facilities, including high hazard areas such as,
veterinary facilities, medical/dental facilities, as well as, boiler plants, barracks and kitchen facilities.
Installation of Backflow Preventers – Fort Lewis
Browse by Project Type
Our Committment
Washington Engineering is dedicated to exceptional, responsive client services and the highest quality of professional architectural and engineering consulting.