This project included field surveys and mapping of underground utilities throughout the campus area and provided for demolition of an existing directburied AC piping system with new piping located in a 7,000 linear foot utilidor for hot water supply and return piping. The utilidor included a cable tray and fiber optic cabling for future expansion of the college’s data network.
Our work included:
- Complete civil engineering for utility re-routing and restoration of parking areas and sidewalks
- Mechaniical Engineering design and construction support
- Electrical engineering for fiber optic network, fire alarm cabling, energy monitoring system and telephone services
- Complete construction support and documentation of As-Built work