Washrack Hangar 1178 Renovation – McChord AFB

This project was for renovation of a 42,000 sf aircraft hangar, including:

  • Design of a new AFFF fire protection system, including a 130,000 gallon water supply tank and a pumphouse with diesel driven supply pumps
  • Replacement of steam fired hot air heating system with a hot water heating system
  • Alterations to ventilation and piping systems
  • Modernization of electrical service and lighting systems
  • Installation of factory finished insulated metal interior wall panels
  • Providing electrically operated insulated metal rollup doors
  • Removing the existing floor finish/joint sealant and installing new elastomeric joint sealants and providing a reflective urethane coating with grit surface over the entire floor slab.

Browse by Project Type

Our Committment

Washington Engineering is dedicated to exceptional, responsive client services and the highest quality of professional architectural and engineering consulting.