This Delivery Order designs spill containment features around two existing jet fuel areas.
Work includes the addition of curbing to contain spills and construction of a concrete vault type oil/water separator at each site. Since the jet fuel may contain de-icing agents, the effluent from the separators cannot be discharged directly to surface waters.
The project includes connections to the sanitary sewer system at each site. Work at the POL site near Building 1158 includes design of a lift station and force main since there is insufficient elevation to permit installation of a gravity flow system.