North Intermodal Yard (Pavement, Railtrack and Drainage) – Port of Tacoma
  • Field Surveys and As-Built documentation
  • Raised and re-ballasted 1100 linear feet of Railtrack
  • Rebuilt two railtrack/straddle carrier crossings
  • Removed 1400 SY of failed roller compacted concrete pavements and replaced the panels with reinforced concrete pavement with a depth of 12-inches
  • Construction support, including review of contractor submittals, processing “Requests for Information”, and weekly construction progress meetings
  • Design work included preparation of Schematic Design, Design Development, Final construction drawings and specifications and support during bidding.