This project performed design for expansion of the alert apron for additional KC135R aircraft parking. The work included:
- Design of a 3,000 sy addition to an existing apron to accommodate basing of 12 additional KC135R tanker aircraft
- Utilities relocations
- Cathodic Protection on piping systems
- Modification of taxiway lighting systems.