This project was for design of a 980 sf facility with an exterior 630 sf vehicle washdown facility. The facility was designed for the handling and storage of pesticides and related pest control equipment.
Work included:
- Site improvements and extension of utilities
- Concrete foundation and floor slab, with water containment features
- Hazardous material storage areas with explosion proof electrical systems
- Complete mechanical and electrical systems
- Locker, toilet, shower, and breakroom facilities
- Installation of emergency eyewash facilities.